
Clearbrook High School, CCISD
Institutional/Industrial Facilities | September 2017
Performed topographic and boundary survey in three phases and provided CADD drawings with underground utilities.
Institutional/Industrial Facilities | September 2017
Performed topographic and boundary survey in three phases and provided CADD drawings with underground utilities.