
Individualized Learning Center, Alief ISD
Institutional/Industrial Facilities | September 2017
Performed partial topographic survey of a nine-acre site, including the verification and preparation of a partial topographic map.
Institutional/Industrial Facilities | September 2017
Performed partial topographic survey of a nine-acre site, including the verification and preparation of a partial topographic map.