Taxiway/Apron – Montgomery County Airport – Conroe, Texas

This project consists of the construction of a new Taxiway to a new hangar area south of Dorbandt Drive, and associated appurtenances. Provided surveying of approximately 6 acres, including establishing the horizontal and vertical control tied to the airport control; locating centerline of North Parkway, Dorbandt Drive and Taxiway E; locating all utilities, signs and... Read more »

Runway 9-27 Rehabilitation – George Bush Intercontinental Airport Houston

Provided detailed topographic surveys and mapping for Runway 9-27, Taxiway SA, and all connecting taxiways to the runway, including limits of pavement, pavement markings, lights, manholes, handholes, culverts, drainage structures, and ditches. Additional surveying was provided for lighting and signage along Taxiways SB, SC, SD, SF, and SX, and for service roadway markings around Terminal... Read more »

Runway 14-32 Rehabilitation – Coulter Field – Bryan, Texas

This project consists of the rehabilitation of Runway 14-32, parallel taxiway, and stub taxiways; reconstruction of the existing terminal apron and a 6,700-square-yard apron expansion; construction of two new hangar access taxiways and installation of area lighting around the terminal apron. Provided topographic surveying, including field surveying for design purposes, setting horizontal and vertical control... Read more »