
Runway 14-32 Rehabilitation – Coulter Field – Bryan, Texas
Airports | May 2017
This project consists of the rehabilitation of Runway 14-32, parallel taxiway, and stub taxiways; reconstruction of the existing terminal apron and a 6,700-square-yard apron expansion; construction of two new hangar access taxiways and installation of area lighting around the terminal apron. Provided topographic surveying, including field surveying for design purposes, setting horizontal and vertical control for construction along with quality control checks during construction.