University of Houston’s Robertson Stadium Renovations

Performed topographic survey for City of Houston water, sanitary sewer, and storm sewer, plan and profile utility drawings; survey for 20-inch storm sewer force main design in conjunction with storm sewer pump station design; survey for Storm Water Pollution Prevention Plan (SW3P) report and design drawings and details.  TSC also managed civil construction phase of the project.